- BDC006 BDC Local Plan Garden Communities Update Highways Transport Planning June 17
- BDC012 Braintree IDP Final Report updated October 2017 123
- BDC034 Highways Interim Assessment June 2016
- BDC035 1/3 Highways Braintree LP Preferred Option Assessment FINAL
- BDC035 2/3 HighwaysTransport Planning Preferred Option Assessment AppendixAF March 2017
- BDC035 3/3 HighwaysTransport Planning Preferred Option Assessment AppendixGL March 2017
- BDC036 Highways Preferred Option Assessment Update A120 and A12 May 2017
- CBC0006 Infrastructure Delivery Plan
- CBC0021 Indoor Sports Facilities Strategy and Action Plan 2015 2037
- CBC0022 Playing Pitch Strategy and Action Plan 2015 2025
- CBC0046 2/2 Colchester Local Plan Traffic Modelling Support Document
- CBC0046.1.2 Colchester Local Plan Traffic Modelling Technical Report
- CBC0047 Colchester Rapid Transport Report
- CBC0049 Community Infrastructure Levy Review of Evidence Base
- CBC0051 Local Plan Traffic Modelling Technical Report
- CBC0052 Travel to Work Patterns
- EB/080 Mode Share Strategy for the North Essex Garden Communities June 2019
- EB014 North Essex Garden Communities Movement Access Study May 2017
- EB040 Local Transport Plan June 2011
- EB041 Greater Essex Growth and Infrastructure Framework Feb 2017
- EB042 First Roads Investment Strategy Central Government March 2015
- EB043 Highways England A12 Chelmsford to A120 Widening Public Consultation
- EB044 ECC Cabinet Report Minutes of meeting 23rd Nov 2017
- EB045 The Anglia Route Study Network Rail March 2016
- EB046 The Anglia Route Study Summary Network Rail March 2016
- EB047 Memorandum of Understanding. Dept for Transport and Network Rail on Rail Enhancements
- EB048 Press Release Abellio 17th October 2016
- EB049 ECC Developers guide to Infrastructure Contributions 2016
- EB068 A120 Options Assessment Report
- EB079 Rapid Transport System for North Essex From Vision to Plan July 2019
- EB087 North Essex Authorities Order of Cost Estimate Report July 2019
- EB088 NEGC Infrastructure Planning Phasing and Delivery July 2019
- EB090 Network Rail New West Tey Station July 2019
- EB67 A120 consultation information
- TDC023 Tendring IDP final report updated 03.10.17
- TDC032 Tendring Local Plan Modelling Support Stage 3 Draft ReIssued 31/05/2017
- TDC033 Tendring Local Plan Modelling stage 2
- TDC034 Tendring Local Plan Modelling Phase 1 Issues and Options