- 32 EB022 Braintree LoWS 2015 Relevent Shared Section 1 Local Plan
- 33 EB023 Tendring LoWS 2015 Relevent Shared Section One Local Plan
- 33EB024 1/3 CBC East Colchester Growth Area Option Environmental Audit Part One
- 34EB024 2/3 CBC East Colchester Growth Area Option Environmental Audit Part Two
- 35EB024 3/3 CBC East Colchester Growth Area Option Environmental Audit Part Three
- BDC012 Braintree Infrastructure Delivery Plan Report June 17
- BDC049 1 5 Strategic Flood Risk Assessment Update Level 1 November 2016
- BDC049 2/5 Strategic Flood Risk Assessment Update Level 1 November 2016 Appendix pt1
- BDC049 3/5 Strategic Flood Risk Assessment Update Level 1 November 2016 Appendix pt2
- BDC049 4/5 Strategic Flood Risk Assessment Update Level 1 November 2016 Appendix pt3
- BDC049 5/5 Strategic Flood Risk Assessment Level 2 January 2017
- BDC050 BDC Water Cycle Study Update March 2017
- BDC054 Strategic Flood Risk Assessment Update
- CBC0028 Environment Agency Response To Flood Risk Sequential Test Methodology
- CBC0029 1/2 Colchester Flood Risk Sequential Test Report Update October 2017
- CBC0030 3/4 Green Infrastructure Strategy Part Two
- CBC0030 4/4 Green Infrastructure Strategy Appendix
- CBC0031 1/3 B Level 2 SFRA Report Final
- CBC0031 1/3A Level 2 SFRA Report Final
- CBC0031 2/3 H Strategic Flood Risk Assessment 2017 Appendix
- CBC0031 2/3A Strategic Flood Risk Assessment 2017 Appendix
- CBC0031 2/3B Strategic Flood Risk Assessment 2017 Appendix
- CBC0031 2/3C Strategic Flood Risk Assessment 2017 Appendix
- CBC0031 2/3D Strategic Flood Risk Assessment 2017 Appendix
- CBC0031 2/3F Strategic Flood Risk Assessment 2017 Appendix
- CBC0031 3/3 Level 2 SFRA Report Final Addendum
- CBC0032 1/8 Level One Strategic Flood Risk Assessment Update
- CBC0032 2/8 Level One Strategic Flood Risk Appendix A Study Area
- CBC0032 3/8 Level 1 Strategic Flood Risk Area Appendix A Figure 2A 2C
- CBC0032 7/8 Level 1 Strategic Flood Risk Area Appendix A Figure 4A 4D
- CBC0032 8/8 Level 1 Strategic Flood Risk Area Appendix A Figure 5 and Figure 6
- CBC0033 1/5 Local Wildlife Site Review
- CBC0033 2/5 Local Wildlife Site Review Colchester 1
- CBC0033 3/5 Local Wildlife Site Review Colchester 2
- CBC0033 4/5 Local Wildlife Site Review Colchester 3
- CBC0033 5/5 Local Wildlife Site Review Colchester 4
- CBC0048 Colchester Water Cycle Study
- CBC0058 1/2 Land to east of Colchester Cultural Heritage Audit
- CBC0058 2/2 East of Colchester Figures
- CBC0059 1/2 Land to west of Colchester Cultural Heritage Audit
- CBC0059 2/2 West of Colchester Figures
- CBC0060 0/8 List of Extracts from Colchester Open Countryside Report as relevant to Section One Local Plan
- CBC0060 05/8 Extract from CBC s Open Countryside Report as relevant to Section 1 LP Sec 10 Copford to Marks Tey
- CBC0060 06/8 Extract from Colchester Open Countryside Report Marks Tey to Little Tey
- CBC0060 2/8 Extract from Colchester Open Countryside Report as relevant to Section One Local Plan. Section 2 Colchester Wivenhoe Tex
- CBC00600 1/8 Extract from Colchester Countryside Report as relevant to Section One Local Plan. Section 1 Summary Final Report In
- CBC00600 3/8 Extract from Colchester Open Countryside Report as relevant to Section One Local Plan Section 2 Colchester Wivenhoe Ma p
- CBC00600 4/8 Extract from Colchester Open Countryside Report as relevant to Section One Local Plan Section 2 Colchester Wivenhoe Map 2
- CBC00600 7/8 Extract from Colchester Open Countryside Report as relevant to Section One Local Plan Section12 Marks Tey to Easthorpe
- CBC00600 8/8 Extract from Colchester Open Countryside Report as relevant to Section One Local Plan Section 13 Summary and Conclusions