Get the best from this site

We use simple text files called 'cookies' to collect statistics and other information about the use of our website. Cookies help us keep the site relevant and up-to-date. All information collected is anonymous. For more information including how to turn cookies off, see more about cookies. Or simply continue below:

Braintree District Council

The following documents are available for download. Documents in PDF format can be read using Adobe Reader.

MS Word and Powerpoint documents can be read by using their respective applications or any alternatives.

Available downloads

Core Strategy Evidence Base - Core Strategy Documents

E1 Braintree District Local Plan Review 2005 PDF (PDF)

  • Size: 8.8 KB
  • Estimated download time: (56k = 2 secs)

E2 Braintree District 2025 Issues and Options, April 2007 PDF (PDF)

  • Size: 495.53 KB
  • Estimated download time: (56k = 1 mins 14 secs)

E3 One District One Vision A Draft Strategy for People and Places in the Braintree District to 2025, October 2008 PDF (PDF)

  • Size: 3.44 MB
  • Estimated download time: (56k = 8 mins 36 secs)

E4 Technical Supplement to A Draft Strategy for People and Places in the Braintree District to 2025, October 2008 PDF (PDF)

  • Size: 2.69 MB
  • Estimated download time: (56k = 6 mins 44 secs)

E6 Addendum of Focused and Minor Changes to the Core Strategy, October 2010 PDF (PDF)

  • Size: 1.02 MB
  • Estimated download time: (56k = 2 mins 33 secs)

Inspector's Report into the Examination BDC Core Strategy DPD, July 2011 PDF (PDF)

  • Size: 125.72 KB
  • Estimated download time: (56k = 19 secs)

Inspector's Report Appendix A Council's Changes Necessary for Soundness, July 2011 PDF (PDF)

  • Size: 47.18 KB
  • Estimated download time: (56k = 7 secs)

Inspector's Report Appendix B Council's Minor Changes, July 2011 PDF (PDF)

  • Size: 102.74 KB
  • Estimated download time: (56k = 16 secs)

Core Strategy Evidence Base - General

E7 East of England Plan, May 2008 PDF (PDF)

  • Size: 3.47 MB
  • Estimated download time: (56k = 8 mins 41 secs)

E8 One District One Vision. A Strategy for People and Places in the Braintree District to 2026 - Sustainable Community Strategy, June 2009 PDF (PDF)

  • Size: 852.19 KB
  • Estimated download time: (56k = 2 mins 5 secs)

E9 Statement of Community Involvement 2006 and Supplement 2009 PDF (PDF)

  • Size: 671.86 KB
  • Estimated download time: (56k = 1 mins 39 secs)

E10 Local Development Scheme Second Review, March 2010 PDF (PDF)

  • Size: 1.66 MB
  • Estimated download time: (56k = 4 mins 9 secs)

E11.1 Statement of Consultation - BDC Committee Reports relating to LDF Core Strategy PDF (PDF)

  • Size: 9.64 MB
  • Estimated download time: (56k = 24 mins 5 secs)

E11.2 Statement of Consultation - Addendum BDC Committee Reports Relating to LDF Core Strategy PDF (PDF)

  • Size: 4.84 MB
  • Estimated download time: (56k = 12 mins 6 secs)

E12 Equalities Impact Assessment for the Draft Strategy for People and Places in Braintree District to 2025 2009 PDF (PDF)

  • Size: 253.06 KB
  • Estimated download time: (56k = 38 secs)

E13 Equalities Impact Assessment for the Core Strategy Submission Draft, April 2010 PDF (PDF)

  • Size: 86.65 KB
  • Estimated download time: (56k = 13 secs)

Core Strategy Evidence Base - Housing

E14 Urban Capacity Study Non Technical Summary, October 2007 PDF (PDF)

  • Size: 403.4 KB
  • Estimated download time: (56k = 1 mins 0 secs)

E14 Urban Capacity Study - volume 1, October 2007 PDF (PDF)

  • Size: 1.07 MB
  • Estimated download time: (56k = 2 mins 41 secs)

E14 Urban Capacity Study - volume 2 (design case studies), October 2007 PDF (PDF)

  • Size: 3.29 MB
  • Estimated download time: (56k = 8 mins 14 secs)

E14 Urban Capacity Study - volume 3 (site schedules), October 2007 PDF (PDF)

  • Size: 687.08 KB
  • Estimated download time: (56k = 1 mins 41 secs)

E14 Urban Capacity Study - volume 4 (mapping), October 2007 PDF (PDF)

  • Size: 13.51 MB
  • Estimated download time: (56k = 33 mins 45 secs)

E15 Strategic Housing Land Availability Assessment (SHLAA), November 2010 PDF (PDF)

  • Size: 6.14 MB
  • Estimated download time: (56k = 15 mins 20 secs)

E16 Strategic Housing Market Assessment (SHMA), February 2008 PDF (PDF)

  • Size: 5.47 MB
  • Estimated download time: (56k = 13 mins 39 secs)

E17 SHMA Update, April 2009 PDF (PDF)

  • Size: 697.42 KB
  • Estimated download time: (56k = 1 mins 44 secs)

E18 SHMA Update, Summer 2010 PDF (PDF)

  • Size: 749.13 KB
  • Estimated download time: (56k = 1 mins 50 secs)

E19 Affordable Housing Viability Study, November 2009 PDF (PDF)

  • Size: 2.08 MB
  • Estimated download time: (56k = 5 mins 11 secs)

E20 Affordable Housing SPD, May 2006 PDF (PDF)

  • Size: 246.4 KB
  • Estimated download time: (56k = 37 secs)

E21 Affordable Housing SPD Sustainability Appraisal, May 2006 PDF (PDF)

  • Size: 229.52 KB
  • Estimated download time: (56k = 34 secs)

E22 Accommodation for Gypsy and Traveller and Travelling Showpeople in the East of England. A revision to the RSS, July 2009 PDF (PDF)

  • Size: 2.83 MB
  • Estimated download time: (56k = 7 mins 5 secs)

E23 Essex Gypsy and Traveller Accommodation Assessment, November 2009 PDF (PDF)

  • Size: 2.36 MB
  • Estimated download time: (56k = 5 mins 56 secs)

Core Strategy Evidence Base - Economy

E24 Mid Essex Economic Futures, March 2006 PDF (PDF)

  • Size: 5.2 MB
  • Estimated download time: (56k = 13 mins 0 secs)

E25 Going for Growth Investing in Your Future - Economic Development Strategy, June 2009 PDF (PDF)

  • Size: 1.17 MB
  • Estimated download time: (56k = 2 mins 56 secs)

E26 Braintree District Futures 2025, October 2006 PDF (PDF)

  • Size: 1007.19 KB
  • Estimated download time: (56k = 2 mins 29 secs)

E27 Employment Land Review - volume 1, November 2007 PDF (PDF)

  • Size: 1.03 MB
  • Estimated download time: (56k = 2 mins 35 secs)

E27 Employment Land Review - volume 2 (site schedules), November 2007 PDF (PDF)

  • Size: 817.29 KB
  • Estimated download time: (56k = 2 mins 0 secs)

E27 Employment Land Review - volume 3 (mapping), November 2007 PDF (PDF)

  • Size: 10.19 MB
  • Estimated download time: (56k = 25 mins 27 secs)

E28 Rural Services Survey, 2008 PDF (PDF)

  • Size: 2.3 MB
  • Estimated download time: (56k = 5 mins 45 secs)

Core Strategy Evidence Base - Retail and Town Centre

E29 The North Essex Authorities Retail Study - stage 1 report (strategic overview), 2006 PDF (PDF)

  • Size: 12.89 MB
  • Estimated download time: (56k = 32 mins 11 secs)

E30 The North Essex Authorities Retail Study - stage 2 report (Braintree District Council), 2006 PDF (PDF)

  • Size: 682.83 KB
  • Estimated download time: (56k = 1 mins 41 secs)

E30 The North Essex Authorities Retail Study - stage 2 report, appendix 1, 2006 PDF (PDF)

  • Size: 81.75 KB
  • Estimated download time: (56k = 12 secs)

E30 The North Essex Authorities Retail Study - stage 2 report, appendix 2, 2006 PDF (PDF)

  • Size: 45.65 KB
  • Estimated download time: (56k = 7 secs)

E30 The North Essex Authorities Retail Study - stage 2 report, appendix 3, 2006 PDF (PDF)

  • Size: 105.36 KB
  • Estimated download time: (56k = 16 secs)

E30 The North Essex Authorities Retail Study - stage 2 report, appendix 4, 2006 PDF (PDF)

  • Size: 70.13 KB
  • Estimated download time: (56k = 11 secs)

E31 Braintree Town Centre Preliminary Development Analysis, April 2009 PDF (PDF)

  • Size: 5.83 MB
  • Estimated download time: (56k = 14 mins 33 secs)

E32 Braintree District Retail Study Update, April 2010 PDF (PDF)

  • Size: 1.21 MB
  • Estimated download time: (56k = 3 mins 2 secs)

Core Strategy Evidence Base - Transport

E33 Local Transport Plan 2006-2011 - part 1, 2005 PDF (PDF)

  • Size: 2.72 MB
  • Estimated download time: (56k = 6 mins 47 secs)

E33 Local Transport Plan 2006-2011 - part 2, 2005 PDF (PDF)

  • Size: 2.58 MB
  • Estimated download time: (56k = 6 mins 29 secs)

E33 Local Transport Plan 2006-2011 - part 3, 2005 PDF (PDF)

  • Size: 5.41 MB
  • Estimated download time: (56k = 13 mins 30 secs)

E33 Local Transport Plan 2006-2011 - appendices part 1, 2005 PDF (PDF)

  • Size: 3.58 MB
  • Estimated download time: (56k = 8 mins 57 secs)

E33 Local Transport Plan 2006-2011 - appendices part 2, 2005 PDF (PDF)

  • Size: 6.18 MB
  • Estimated download time: (56k = 15 mins 26 secs)

E33 Local Transport Plan 2006-2011 - appendices part 3, 2005 PDF (PDF)

  • Size: 49.96 KB
  • Estimated download time: (56k = 8 secs)

E34 Assessment of Impact of Potential LDF Sites on Existing Junctions- Braintree and Witham LDF Allocations, July 2008 PDF (PDF)

  • Size: 327.65 KB
  • Estimated download time: (56k = 48 secs)

E35 Assessment of Impact of Potential LDF Sites on Existing Junctions, April 2010 PDF (PDF)

  • Size: 9.65 MB
  • Estimated download time: (56k = 24 mins 6 secs)

E35a Braintree Panfield Lane Sensitivity Test, July 2010 PDF (PDF)

  • Size: 130.05 KB
  • Estimated download time: (56k = 20 secs)

E36 Parking Standards Design and Good Practice, September 2009 PDF (PDF)

  • Size: 4.58 MB
  • Estimated download time: (56k = 11 mins 26 secs)

Core Strategy Evidence Base - Environment

E37.1 Mid Essex Strategic Flood Risk Assessment, October 2007 PDF (PDF)

  • Size: 2.2 MB
  • Estimated download time: (56k = 5 mins 30 secs)

E37.2 Mid Essex Strategic Flood Risk Assessment Appendix A Braintree, October 2007 (figs. A3-1 onwards available separately on request) PDF (PDF)

  • Size: 1.78 MB
  • Estimated download time: (56k = 4 mins 27 secs)

E38 Braintree District, Haverhill and Clare Water Cycle Study Stage 1, November 2008 PDF (PDF)

  • Size: 12.76 MB
  • Estimated download time: (56k = 31 mins 53 secs)

E39 Braintree District Stage 2 Water Cycle Study, January 2011 PDF (PDF)

  • Size: 6.27 MB
  • Estimated download time: (56k = 15 mins 41 secs)

E40 Landscape Character Assessment - preface and executive summary, September 2006 PDF (PDF)

  • Size: 242.64 KB
  • Estimated download time: (56k = 36 secs)

E40 Landscape Character Assessment - section 1 (Introduction), September 2006 PDF (PDF)

  • Size: 48.88 KB
  • Estimated download time: (56k = 8 secs)

E40 Landscape Character Assessment - section 2 (Overview of the Study Area), September 2006 PDF (PDF)

  • Size: 102.27 KB
  • Estimated download time: (56k = 15 secs)

E40 Landscape Character Assessment - section 3 (Landscape Character of Braintree District), September 2006 PDF (PDF)

  • Size: 12.16 MB
  • Estimated download time: (56k = 30 mins 23 secs)

E40 Landscape Character Assessment - section 4 (Landscape Character of Brentwood Borough), September 2006 PDF (PDF)

  • Size: 4.48 MB
  • Estimated download time: (56k = 11 mins 11 secs)

E40 Landscape Character Assessment - section 5 (Landscape Character of Chelmsford Borough), September 2006 PDF (PDF)

  • Size: 1.42 MB
  • Estimated download time: (56k = 3 mins 33 secs)

E40 Landscape Character Assessment - section 6 (Landscape Character of Maldon Borough), September 2006 PDF (PDF)

  • Size: 2.22 MB
  • Estimated download time: (56k = 5 mins 33 secs)

E40 Landscape Character Assessment - section 7 (Landscape Character of Uttlesford District), September 2006 PDF (PDF)

  • Size: 1.84 MB
  • Estimated download time: (56k = 4 mins 36 secs)

E40 Landscape Character Assessment - section 8 (Recommendations), September 2006 PDF (PDF)

  • Size: 45.52 KB
  • Estimated download time: (56k = 7 secs)

E40 Landscape Character Assessment - appendices, September 2006 PDF (PDF)

  • Size: 88.63 KB
  • Estimated download time: (56k = 13 secs)

E40 LCA Figure 1.1 (The Study Area) PDF (PDF)

  • Size: 422.17 KB
  • Estimated download time: (56k = 1 mins 2 secs)

E40 LCA Figure 2.1 (Surface Geology) PDF (PDF)

  • Size: 132.4 KB
  • Estimated download time: (56k = 20 secs)

E40 LCA Figure 2.2 (Landform and Drainage) PDF (PDF)

  • Size: 279.77 KB
  • Estimated download time: (56k = 41 secs)

E40 LCA Figure 2.3 (Nature Conservation Designations) PDF (PDF)

  • Size: 933.4 KB
  • Estimated download time: (56k = 2 mins 17 secs)

E40 LCA Figure 2.4 (Historic Landscape Character Types and Areas) PDF (PDF)

  • Size: 372.48 KB
  • Estimated download time: (56k = 55 secs)

E40 LCA Figure 2.5 (National Joint Character Areas) PDF (PDF)

  • Size: 184.13 KB
  • Estimated download time: (56k = 27 secs)

E40 LCA Figure 2.6 (National Landscape Typology) PDF (PDF)

  • Size: 138.77 KB
  • Estimated download time: (56k = 21 secs)

E40 LCA Figure 2.7 (County Landscape Character Types and Areas) PDF (PDF)

  • Size: 132.43 KB
  • Estimated download time: (56k = 20 secs)

E40 LCA Figure 2.8 (District Borough Landscape Character Types and Areas In The Study Area) PDF (PDF)

  • Size: 228.39 KB
  • Estimated download time: (56k = 34 secs)

E40 LCA Figure 3.1 (Braintree District Landscape Character Types and Areas) PDF (PDF)

  • Size: 3.78 MB
  • Estimated download time: (56k = 9 mins 27 secs)

E41 Settlement Fringe Landscape Capacity Study - Braintree, November 2007 PDF (PDF)

  • Size: 3.62 MB
  • Estimated download time: (56k = 9 mins 3 secs)

E41 Settlement Fringe Landscape Capacity Study - Coggeshall, November 2007 PDF (PDF)

  • Size: 5.55 MB
  • Estimated download time: (56k = 13 mins 51 secs)

E41 Settlement Fringe Landscape Capacity Study - Earls Colne, November 2007 PDF (PDF)

  • Size: 7.25 MB
  • Estimated download time: (56k = 18 mins 6 secs)

E41 Settlement Fringe Landscape Capacity Study - Halstead, November 2007 PDF (PDF)

  • Size: 2.89 MB
  • Estimated download time: (56k = 7 mins 14 secs)

E41 Settlement Fringe Landscape Capacity Study - Hatfield Peverel, November 2007 PDF (PDF)

  • Size: 6.76 MB
  • Estimated download time: (56k = 16 mins 54 secs)

E41 Settlement Fringe Landscape Capacity Study - Kelvedon, November 2007 PDF (PDF)

  • Size: 6.59 MB
  • Estimated download time: (56k = 16 mins 29 secs)

E41 Settlement Fringe Landscape Capacity Study - Silver End, November 2007 PDF (PDF)

  • Size: 5.33 MB
  • Estimated download time: (56k = 13 mins 20 secs)

E41 Settlement Fringe Landscape Capacity Study - Witham, November 2007 PDF (PDF)

  • Size: 2.94 MB
  • Estimated download time: (56k = 7 mins 21 secs)

E42 Habitats Regulation Assessment, June 2009 PDF (PDF)

  • Size: 1.77 MB
  • Estimated download time: (56k = 4 mins 26 secs)

E42 Habitats Regulation Assessment - amendment, November 2009 PDF (PDF)

  • Size: 127.48 KB
  • Estimated download time: (56k = 19 secs)

E43 Sustainable Accessible Natural Greenspace (SANG) Report, April 2009 PDF (PDF)

  • Size: 6.12 MB
  • Estimated download time: (56k = 15 mins 18 secs)

E44 Braintree Green Spaces Strategy, 2008 PDF (PDF)

  • Size: 6.23 MB
  • Estimated download time: (56k = 15 mins 33 secs)

E44 Appendix 1: Appendix A5 - Black Notley and Terling Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.34 MB
  • Estimated download time: (56k = 5 mins 51 secs)

E44 Appendix 1: Appendix A5 - Bocking Blackwater Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.79 MB
  • Estimated download time: (56k = 6 mins 59 secs)

E44 Appendix 1: Appendix 5 - Bocking North Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.47 MB
  • Estimated download time: (56k = 3 mins 41 secs)

E44 Appendix 1: Appendix A5 - Bocking South Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.35 MB
  • Estimated download time: (56k = 5 mins 53 secs)

E44 Appendix 1: Appendix A5 - Bradwell, Silver End and Rivenhall Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.91 MB
  • Estimated download time: (56k = 7 mins 17 secs)

E44 Appendix 1: Appendix A5 - Braintree Central Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.56 MB
  • Estimated download time: (56k = 6 mins 24 secs)

E44 Appendix 1: Appendix 5 - Braintree East Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.6 MB
  • Estimated download time: (56k = 6 mins 30 secs)

E44 Appendix 1: Appendix A5 - Braintree South Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.46 MB
  • Estimated download time: (56k = 3 mins 39 secs)

E44 Appendix 1: Appendix A5 - Bumpstead Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.62 MB
  • Estimated download time: (56k = 4 mins 5 secs)

E44 Appendix 1: Appendix A5 - Coggeshall and North Feering Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.75 MB
  • Estimated download time: (56k = 6 mins 53 secs)

E44 Appendix 1: Appendix A5 - Cressing and Stisted Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.17 MB
  • Estimated download time: (56k = 2 mins 56 secs)

E44 Appendix 1: Appendix A5 - Gosfield and Greenstead Green Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 5.2 MB
  • Estimated download time: (56k = 12 mins 59 secs)

E44 Appendix 1: Appendix A5 - Great Notley and Braintree West Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 3 MB
  • Estimated download time: (56k = 7 mins 32 secs)

E44 Appendix 1: Appendix A5 - Halstead St Andrews Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 3.35 MB
  • Estimated download time: (56k = 8 mins 23 secs)

E44 Appendix 1: Appendix A5 - Halstead Trinity Ward, Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.28 MB
  • Estimated download time: (56k = 3 mins 12 secs)

E44 Appendix 1: Appendix A5 - Hatfield Peverel Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.45 MB
  • Estimated download time: (56k = 3 mins 38 secs)

E44 Appendix 1: Appendix A5 - Hedingham and Maplestead Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 3.59 MB
  • Estimated download time: (56k = 8 mins 59 secs)

E44 Appendix 1: Appendix A5 - Kelvedon Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.66 MB
  • Estimated download time: (56k = 4 mins 9 secs)

E44 Appendix 1: Appendix A5 - Panfield Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.68 MB
  • Estimated download time: (56k = 4 mins 14 secs)

E44 Appendix 1: Appendix A5 - Rayne Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 850.96 KB
  • Estimated download time: (56k = 2 mins 5 secs)

E44 Appendix 1: Appendix A5 - Stour Valley North Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 3.73 MB
  • Estimated download time: (56k = 9 mins 20 secs)

E44 Appendix 1: Appendix A5 - Stour Valley South Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.5 MB
  • Estimated download time: (56k = 6 mins 15 secs)

E44 Appendix 1: Appendix A5 - The Three Colnes Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.37 MB
  • Estimated download time: (56k = 5 mins 56 secs)

E44 Appendix 1: Appendix A5 - Three Fields Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.11 MB
  • Estimated download time: (56k = 5 mins 17 secs)

E44 Appendix 1: Appendix A5 - Upper Colne Ward, Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.21 MB
  • Estimated download time: (56k = 5 mins 32 secs)

E44 Appendix 1: Appendix A5 - Witham Chipping Hill and Central Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 4.48 MB
  • Estimated download time: (56k = 11 mins 12 secs)

E44 Appendix 1: Appendix A5 - Witham North Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.51 MB
  • Estimated download time: (56k = 3 mins 47 secs)

E44 Appendix 1: Appendix A5 - Witham South Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 2.63 MB
  • Estimated download time: (56k = 6 mins 35 secs)

E44 Appendix 1: Appendix A5 - Witham West Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.56 MB
  • Estimated download time: (56k = 3 mins 56 secs)

E44 Appendix 1: Appendix A5 - Yeldham Ward - Green Spaces Strategy Maps, 2008 PDF (PDF)

  • Size: 1.04 MB
  • Estimated download time: (56k = 2 mins 36 secs)

E45 Open Spaces Supplementary Planning Document, November 2009 PDF (PDF)

  • Size: 1.66 MB
  • Estimated download time: (56k = 4 mins 9 secs)

E45a Open Spaces Action Plan, February 2011 PDF (PDF)

  • Size: 648.62 KB
  • Estimated download time: (56k = 1 mins 35 secs)

Open Spaces Action Plan 2014 PDF (PDF)

  • Size: 3.34 MB
  • Estimated download time: (56k = 8 mins 21 secs)

E46 Open Space SPD, Sustainability Appraisal, November 2009 PDF (PDF)

  • Size: 1.64 MB
  • Estimated download time: (56k = 4 mins 6 secs)

E47 The Essex Biodiversity Action Plan, 1999 PDF (PDF)

  • Size: 2.23 MB
  • Estimated download time: (56k = 5 mins 35 secs)

Core Strategy Evidence Base - Sustainability Appraisal

E49 Issues and Options, Core Strategy DPD Reg 25 SEA and SA - Non-Technical Summary, 2007 PDF (PDF)

  • Size: 516.55 KB
  • Estimated download time: (56k = 1 mins 17 secs)

E49 Issues and Options - SA and SEA Environmental Report, May 2007 PDF (PDF)

  • Size: 301.59 KB
  • Estimated download time: (56k = 45 secs)

E49 Issues and Options - SA and SEA Environmental Report - annex 1 (Baseline Information), April 2007 PDF (PDF)

  • Size: 2.82 MB
  • Estimated download time: (56k = 7 mins 3 secs)

E49 Issues and Options - SA and SEA Environmental Report - annex 2 (Review of Plans and Programmes), May 2007 PDF (PDF)

  • Size: 280.77 KB
  • Estimated download time: (56k = 42 secs)

E49 Issues and Options - SA and SEA Environmental Report - Appraisal Matrix, July 2007 PDF (PDF)

  • Size: 601.45 KB
  • Estimated download time: (56k = 1 mins 29 secs)

E50 SA SEA of 'One District One Vision' Core Strategy Preferred Options, October 2008 PDF (PDF)

  • Size: 314.77 KB
  • Estimated download time: (56k = 47 secs)

E51 SEA Baseline Information Profile 2009-2010 - Executive Summary PDF (PDF)

  • Size: 148.39 KB
  • Estimated download time: (56k = 22 secs)

E52 SEA Baseline Information Profile 2009-2010 PDF (PDF)

  • Size: 5.89 MB
  • Estimated download time: (56k = 14 mins 44 secs)

E53 SEA Baseline Information Profile 2009-2010 - Plans and Programmes PDF (PDF)

  • Size: 466.44 KB
  • Estimated download time: (56k = 1 mins 9 secs)

E54 Core Strategy Submission Draft - SA and SEA Non-Technical Summary, April 2010 PDF (PDF)

  • Size: 383.89 KB
  • Estimated download time: (56k = 57 secs)

E54 Core Strategy Submission Draft - SA and SEA Environmental Report, April 2010 PDF (PDF)

  • Size: 564.34 KB
  • Estimated download time: (56k = 1 mins 23 secs)

E54 Core Strategy Submission Draft - SA and SEA Environmental Report - annex a (Plans and Programmes), April 2010 PDF (PDF)

  • Size: 282.94 KB
  • Estimated download time: (56k = 42 secs)

E54 Core Strategy Submission Draft - SA and SEA Environmental Report - annex b (Baseline Information), April 2010 PDF (PDF)

  • Size: 4.71 MB
  • Estimated download time: (56k = 11 mins 47 secs)

E54 Core Strategy Submission Draft - SA and SEA Environmental Report - annex c (Sustainability Framework), April 2010 PDF (PDF)

  • Size: 153.07 KB
  • Estimated download time: (56k = 23 secs)

E54 Core Strategy Submission Draft - SA and SEA Environmental Report - annex d (Appraisal Alt. Locations), April 2010 PDF (PDF)

  • Size: 321.26 KB
  • Estimated download time: (56k = 47 secs)

E54 Core Strategy Submission Draft - SA and SEA Environmental Report - annex e (Appraisal Matrices), April 2010 PDF (PDF)

  • Size: 223.61 KB
  • Estimated download time: (56k = 33 secs)

E54 Core Strategy Submission Draft - SA and SEA Environmental Report - annex f (Quality Assurance Checklist), April 2010 PDF (PDF)

  • Size: 56.62 KB
  • Estimated download time: (56k = 9 secs)

E55 SA SEA Addendum of Focused Changes to Core Strategy Submission Document - Environmental Report, October 2010 PDF (PDF)

  • Size: 148.78 KB
  • Estimated download time: (56k = 22 secs)

E55 SA SEA Addendum of Focused Changes - Environmental Report - annex a (Appraisal Matrices), October 2010 PDF (PDF)

  • Size: 400.75 KB
  • Estimated download time: (56k = 59 secs)

E55 SA SEA Addendum of Focused Changes - Environmental Report - annex b (SA_SEA Review), October 2010 PDF (PDF)

  • Size: 209.7 KB
  • Estimated download time: (56k = 31 secs)

E56 SA SEA Baseline Information Profile 2010-2011, December 2010 PDF (PDF)

  • Size: 9.79 MB
  • Estimated download time: (56k = 24 mins 27 secs)

E57 SA SEA Baseline Information Profile - Non-Technical Summary 2010-2011, December 2010 PDF (PDF)

  • Size: 111.95 KB
  • Estimated download time: (56k = 17 secs)

E58 SA SEA Baseline Information Profile 2010-2011 - Plans and Programmes, December 2010 PDF (PDF)

  • Size: 186.82 KB
  • Estimated download time: (56k = 28 secs)

Core Strategy SA SEA Summary of Alternatives, May 2011 PDF (PDF)

  • Size: 97.21 KB
  • Estimated download time: (56k = 15 secs)

Core Strategy Evidence Base - Monitoring

E59 Annual Monitoring Report, 2009 PDF (PDF)

  • Size: 3.46 MB
  • Estimated download time: (56k = 8 mins 39 secs)

E60 (Part 1) Residential Land Availability as at 31st March 2009 PDF (PDF)

  • Size: 9.76 MB
  • Estimated download time: (56k = 24 mins 23 secs)

E60 (Part 2) Residential Land Availability as at 31st March 2009 PDF (PDF)

  • Size: 8.77 MB
  • Estimated download time: (56k = 21 mins 56 secs)

E61 Non-Residential Land Availability as at 31st March 2009 PDF (PDF)

  • Size: 9.47 MB
  • Estimated download time: (56k = 23 mins 39 secs)

E62 Annual Monitoring Report 2010 PDF (PDF)

  • Size: 5.69 MB
  • Estimated download time: (56k = 14 mins 14 secs)

E63 (Part 1) Residential Land Availability as at 31st March 2010 PDF (PDF)

  • Size: 10.67 MB
  • Estimated download time: (56k = 26 mins 38 secs)

E63 (Part 2) Residential Land Availability as at 31st March 2010 PDF (PDF)

  • Size: 10.04 MB
  • Estimated download time: (56k = 25 mins 5 secs)

E64 Non-Residential Land Availability as at 31st March 2010 PDF (PDF)

  • Size: 5.19 MB
  • Estimated download time: (56k = 12 mins 59 secs)

Core Strategy Evidence Base - Core Strategy Submission Documents

E65 Public Notice Regulation 25 PDF (PDF)

  • Size: 1.59 MB
  • Estimated download time: (56k = 3 mins 59 secs)

E66 Specific Consultation Bodies Consulted PDF (PDF)

  • Size: 27.09 KB
  • Estimated download time: (56k = 4 secs)

E67 Letter to EELGA notifying of pre submission consultation PDF (PDF)

  • Size: 35.66 KB
  • Estimated download time: (56k = 6 secs)

E68 Public Notice Regulation 27 PDF (PDF)

  • Size: 12.77 KB
  • Estimated download time: (56k = 2 secs)

E70 All Comments to Focused Changes PDF (PDF)

  • Size: 74.71 KB
  • Estimated download time: (56k = 11 secs)

E71 Public Notice Regulation 30 PDF (PDF)

  • Size: 11.85 KB
  • Estimated download time: (56k = 2 secs)

E72 Core Strategy Regulation 30 Submission Statement PDF (PDF)

  • Size: 72.47 KB
  • Estimated download time: (56k = 11 secs)

E73 Schedule of housing sites identified 2009 PDF (PDF)

  • Size: 183.98 KB
  • Estimated download time: (56k = 27 secs)

E74 Schedule of housing sites identified 2010 PDF (PDF)

  • Size: 168.31 KB
  • Estimated download time: (56k = 25 secs)

E75 Small sites development progress review PDF (PDF)

  • Size: 7.58 KB
  • Estimated download time: (56k = 2 secs)

Core Strategy Evidence Base - Statements of Common Ground

SoCG1 Statement of Common Ground on land to the south-west of Witham between Redrow Homes (Easter), Essex County Council and Braintree District Council PDF (PDF)

  • Size: 32.48 KB
  • Estimated download time: (56k = 5 secs)

SoCG2 Statement of Common Ground on land to the south-west of Witham waste water between Redrow Homes (eastern), Anglian Water Services and Braintree District Council PDF (PDF)

  • Size: 17.22 KB
  • Estimated download time: (56k = 3 secs)

SoCG3 Statement of Common Ground on deliverability land to the north-east of Witham between Bellway Homes, Braintree District Council and Essex County Council PDF (PDF)

  • Size: 26.85 KB
  • Estimated download time: (56k = 4 secs)

SoCG4 Statement of Common Highways Ground on land to the north-east of Witham between Bellway Homes, Braintree District Council and Essex County Council PDF (PDF)

  • Size: 68.22 KB
  • Estimated download time: (56k = 10 secs)

SoCG5 Statement of Common Ground on waste water on land to the north-east of Witham between Bellway Homes, Braintree District Council and Anglian Water Services PDF (PDF)

  • Size: 53.51 KB
  • Estimated download time: (56k = 8 secs)

SoCG6 Statement of Common Ground on north-west Braintree between Mersea Homes/Hills Residential, Braintree District Council and Essex County Council PDF (PDF)

  • Size: 21.9 KB
  • Estimated download time: (56k = 4 secs)

SoCG7 Statement of Common Ground on foul water drainage at Great Notley between Countryside Properties, Anglian Water Services and Braintree District Council PDF (PDF)

  • Size: 27.4 KB
  • Estimated download time: (56k = 5 secs)

Get this feed Braintree District Council Core Strategy Evidence Base feed

Weejot