The Core Strategy is a Development Plan Document (DPD) forming part
of the
Local Development Framework (LDF). It sets out the
spatial vision, spatial objectives and strategy for the development
of the District. A Sustainability Report, prepared by Essex
County Council on behalf of Braintree District Council, accompanies
the document at each stage of the process.
The Core Strategy will cover the whole of the Braintree District
and must be consistent with national policy and the
East of
England Plan.
The Local Development Framework Panel considers reports on the
Core Strategy and other policy issues -
link to LDF Panel agendas and reports
DPD's will be prepared in accordance with the
Statement of Community Involvement (SCI) and will also be the
subject of an independent public examination by an Inspector
appointed by the Government. The Council must incorporate any
changes required by the Inspector and then adopt the DPD.
Once adopted, decisions on planning applications have to be made in
accordance with the plan.
______________________________________________________________________________
CURRENT STAGE OF PREPARATION:
The
Submission Draft Core Strategy was approved by the
Council on 15th February. Final changes will
be made to this pre-Submission Draft following the meeting of
the LDF Panel on 14th April.
Core Strategy Evidence Base Work
A number
of documents have been completed to date and can be viewed on the
Evidence Base page.
The following documents are currently in production:
Strategic Housing Land Availability Assessment (SHLAA) (anticipated
March 2010)
Highways and Transportation Study update (anticipated February
2010)
Retail Study update (anticipated March 2010)
Equalities Impact Assessment (anticipated February 2010)
Schedule of Infrastructure Requirements (anticipated February
2010)
SEA/SA of draft Submission Core Strategy (anticipated March
2010)_____________________________________________________________________________
FUTURE STAGES TIMETABLE:
Pre
Submission Consultation (6wks): April – June (Monday 26th April –
Friday 4th June)
Member Consideration of Reps (4wks): July
Submission to the Secretary of State: August (w/b 16th)
Pre Hearing Meeting: October (w/b 11th)
Hearing (up to 2wks): Nov/Dec (Monday 22nd November – Friday 3rd
December
Inspectors Report Received: April 2011 (w/b 25th)
Adoption: June 2011 (w/b 27th)
_____________________________________________________________________________
PREVIOUS STAGES:
Pre-production Stage A, Development of the Evidence
Base:
A number of preliminary workshops were held
with local organisations and schools, and a 'Contact' questionnaire
was delivered to every property in the District in October
2006. In addition to this a number of studies were
commissioned to help inform the Core Strategy; these are listed
within the document. The results of both of these activities
were used to inform the Issues and Options document.
Production Stage B, Preparation of Preferred Options,
Regulation 25:
The
Issues and Options document built on the work carried out at
the pre-production stage by setting out a series of options for the
future of the area on which views were invited.
Consultation was undertaken in respect of the document for a period
of six weeks from 19th April 2007. The
consultation responses were reported to the
LDF Panel held on 25th July 2007.
-
SEA and SA for Issues and Options Document - Non technical
summary
Consideration of Representations to 'One District - One
Vision' and amendment of document:
The
'People and Places Consultation' on the
'One District - One Vision' - A Draft Strategy for People and
Places in the Braintree District to 2025 document took place
from 31st October 2008 – 19th December 2008. The document
combines the Council's Sustainable Community Strategy and Core
Strategy for planning, and is accompanied by
a
Technical Supplement. The document builds on the Braintree
District 2025 Issues and Options Consultation that was held in
2007. It sets out the Council's preferred locations for
future development.
-
Summary Consultation Guide for 'One District - One
Vision'
-
People and Places Consultation Leaflet
-
One District One Vision Sustainability Appraisal/Strategic
Environmental Assessment Report 2009
Comments received concerning the Draft Core Strategy were
reported to, and considered by, various LDF Panel meetings
during 2009.
______________________________________________________________________________
SUBMISSION OF SITES PROPOSED FOR DEVELOPMENT IN LDF BY
LANDOWNERS/DEVELOPERS:
During the Core Strategy Issue and Options
consultation period we received many representations proposing
sites, which landowners and developers wanted the Council to
consider, when preparing the Core Strategy Preferred Options and
the
Allocations documents. Further site requests were invited
during the period from 28th August to 17th September 2007 and these
were collated in the Sites Proposed for Development in the Local
Development Framework by Landowners/Developers document Volume 1
Urban Responses and Volume 2 Rural Responses.
Additional sites have since been submitted and the Sites
Proposed document has been revised. The information gathered
will help inform the Council’s future Allocations Development Plan
Document.
-
Sites Proposed for Development in LDF by Landowners and or
Developers Volume 1.1 Urban Responses by Ward Name A to F
-
Sites Proposed for Development in LDF by Landowners and or
Developers Volume 1.2 Urban Responses by Ward Name G to W
-
Sites Proposed for Development in LDF by Landowners and or
Developers Volume 2.1 Rural Responses by Ward Name A to F
-
Sites Proposed for Development in LDF by Landowners and or
Developers Volume 2.2 Rural Responses by Ward Name G to W
If you have previously submitted a site and the proposal has
since changed, or if you no longer wish to promote a site, please
notify the Planning Policy section accordingly.
Updated 17/2/2010